Mellitah Oil & Gas is The operator of western Libya gas project (WLGP), which entails the development of two reservoirs; Wafa field located in the south west part of Libya, adjacent to the Libyan-Algerian border Approximately 500 km from the Mediterranean coast, Bahr Essalam field located offshore and covering an area distant between 30 and 350 km from the Libyan coast in water depth ranging from 70 to 350 m.
The main target of the project is to annually produce (10) BCM of sales gas; (8) BCM for export to GELA-Italy through Green Stream 32’’ pipeline and (5) BCM for the local market.

 

Wafa field

Oil and gas field with a significant gas cap and limited quantity of recoverable oil; it is producing gas and associated condensate from the gas cap through (30) gas wells and oil with associated gas from oil zone through (21) oil wells.
The production from (51) wells collected in different gathering stations (NG1, NG2, SG1, NO1 & NO2) and routed for separation and treatment at the central plant.
The on specification gas is delivered to Mellitah by the 32’’ pipeline (527 km), the average gas delivery is about 13 MMSm3 /day.
The production of oil & condensate sent to storage tanks in Wafa field , and then delivered in mixed mode with NGL coming from gas trains to Wafa Coastal plant by 16’’ pipeline for more processing. Approximately 23 KBbls of NGL and 38 KBbls of oil & condensate are delivered daily to Mellitah.

 

Bahr Essalam field

Gas field where gas and associated condensate are produced from (26) wells; (15) platform wells and (11) sub-sea wells.
The production is gathered on the platform where the gas is primarily dehydrated and approximately 28.2 MSCM/D (995 MMSCF/day) of sour gas delivered to Mellitah gas Treatment plants for further treatment by 36’’ sea-line (110 km), the un-stabilized condensate is delivered to Mellitah fractionation and stabilization units  for further processing  by the 10’’sea-line for stabilization.

 

Mellitah Complex

Comprise of Wafa coastal plant, Mellitah plants and Marine export facilities.

 

Wafa Coastal plant

Treats production received from Wafa desert and includes; fractionation and stabilization units to produce oil and LPG; the oil is routed to storage tanks with total capacity of about 2.5 MBbls, and the LPG is routed to the LPG splitter to produce commercial Propane and Butane which finally routed to fully refrigerated storage tanks, Propane storage capacity is about 230 KBbls, Butane storage capacity is about 210 KBbls

 

Mellitah plant

treats production received from Bahr Essalam field and includes; gas Treatment Units (GTU), sulfur recovery units (SRU), fractionation units and condensate stabilization units.

 

Gas plant

The raw gas received from the  Sabratha platform is treated in Mellitah gas  Treatment Units  to produce sales gas, the  Mellitah plant sales gas  combined with sales gas treated at wafa desert via Wafa coastal plant, then the  total  sales gas is delivered through fiscal metering to Mellitah gas compressor station ( MGCS ) for final export to Italy.
In addition the production of LPG (Propane, Butane) and stabilized condensate delivered to storage tanks with capacity of about 860 KBbls.

 

Sulfur RecoveryUunits (SRU)

Sulphur recovery units are designed to convert the H2S removed from the raw gas to elemental sulphur in a liquid form, which’s then sent to past illation unit for solidification and stored and exported  as solid sulphur.
Storage capacity of liquid sulphur is about 17,000 Sm3, and the storage capacity of the solid sulphur is about 25, 000 tons.

Marine export facilities

• Marine loading facilities contains two single mooring point (SPM) for the export of oil and condensate, one (SPM) is dedicated for the export of oil received from El-Feel field and wafa field
• the jetty is equipped for the export of LPG and Solid Sulphur.

 

Products & Production dates

 

Natural Sales Gas

On the first of September 2004 Started delivering gas from Wafa Field to Mellitah compressor station, the average sales gas was about 9.5 MMSm3/day.
Early September 2005 dehydrated gas arrived from Bahr Essalam Field to Mellitah gas plant for treatment and delivery to Green Stream, the average Sales gas from Mellitah gas plant was about 16.5 MMSm3/day.
On November 2005 start first delivery of gas to AR-Ruways power station near Nalut, approximately 5 MSm3 of Wafa sales gas delivered daily to the power station.

 

Crude oil and condensate C5+


On the first of July 2004 Started delivering Crude oil by 16’’ pipeline from Wafa Field, an average of 43 KBbls/day received in Mellitah as mixture of oil & condensate routed to storage facilities.
On the first of November 2005 starts receiving El-Feel crude oil from El-Feel field and mixed with Wafa crude oil in Mellitah complex, the Average oil received was about 140 KBbls/day.

 

Condensate C5+

In September 2005 the first offshore stabilized condensate from Mellitah gas plant was produced with an average daily rate of approximately 35 KBbls.

 

Liquefied Petroleum Gas -LPG (Propane (C3) & Butane (C4))

The first LPG Propane (C3) and Butane (C4) production from Mellitah coastal plant started in November 2004, the average Propane production is about 9 KBbls /day and the average Butane production is about 8 KBbls /day.
on the first of October 2005; the first offshore LPG production from Mellitah gas plant started, with an average production of about 1.6 KBbls /day of Propane and about 1.8 KBbls /day of Butane .

 

Solid Sulfur

the production of Solid Sulfur from pastillation units started on first of July 2006, the average daily production was approximately 350 tons.